DUPRO (mid-production audit): re-inspection passed on 9 Oct 2026. CAPA awaiting close-out.
QC progress
Only Multifabric sees this panel.
Manage CAPA-1041-1 (Re-inspected)
Planned vs actual dates for each production milestone.
Fabric booking
1 day early
Yarn & weave check
1 day early
Dyeing & lab dip approval
1 day early
Cutting
1 day early
DUPRO
4 days late
Final AQL
Due 21 Oct
Ex-factory
Due 26 Oct
ETD (vessel departs)
Due 2 Nov
| Milestone | Planned | Actual | Status |
|---|---|---|---|
| Fabric booking | 16 Aug 2026 | 15 Aug 2026 | 1 day early |
| Yarn & weave check | 30 Aug 2026 | 29 Aug 2026 | 1 day early |
| Dyeing & lab dip approval | 11 Sep 2026 | 10 Sep 2026 | 1 day early |
| Cutting | 23 Sep 2026 | 22 Sep 2026 | 1 day early |
| DUPRO | 5 Oct 2026 | 9 Oct 2026 | 4 days late |
| Final AQL | 21 Oct 2026 | — | Due 21 Oct |
| Ex-factory | 26 Oct 2026 | — | Due 26 Oct |
| ETD (vessel departs) | 2 Nov 2026 | — | Due 2 Nov |
Stage 1 of 5
Greige fabric checked against the approved construction.
Yarn count
Target 30 Ne ±3%
29.9 Ne
Thread count
Target 56 TC ±3%
55 TC
Fabric weight
Target 180 GSM ±5%
182 GSM
Tensile strength (warp)
Target ≥ 250 N
292 N
Process notes
Ring-spun yarn from in-house spinning, lot 7B. Twist checked on 5 cones.
Stage 2 of 5
Bulk shade and fastness tests against the approved lab dip.
Shade standard
Target Heather Grey KN-08
Heather Grey KN-08
Shade match ΔE (CMC 2:1)
Target ≤ 1.0
0.89
Colour fastness to washing
Target Grade ≥ 4
4
Rubbing fastness (dry)
Target Grade ≥ 4
5
Rubbing fastness (wet)
Target Grade ≥ 3
4
Process notes
Continuous pad-steam range, second shift. Shade checked at start, middle and end of batch.
Stage 3 of 5
During-production inspection of measurements, weights and workmanship.
Production complete
58%
Size / measurement checks
Target ≥ 95% in tolerance
30/30 (100%)
Weight checks
Target ≥ 95% in tolerance
19/20 (95%)
Workmanship defects
Target Majors ≤ 5% of sample
1 major · 2 minor in 80 pcs
| D07 | Loose thread | minor | 1 |
|---|---|---|---|
| D09 | Wrong label | major | 1 |
| D10 | Soiling | minor | 1 |
CAPA-1041-1
CAPA re-inspectedOpened 2 Oct 2026Due 9 Oct 2026Re-inspection passed 9 Oct 2026
Process notes
Line 4 and 5 running this style; line 5 operators newer. Hemming folder replaced mid-shift.
Stage 4 of 5
ISO 2859-1, General Level II, single sampling. Major AQL 2.5, minor AQL 4.0.
Lot size
8,000
Sample size (Level II)
200
Major defects (AQL 2.5)
Target Ac 10 / Re 11
0
Minor defects (AQL 4.0)
Target Ac 14 / Re 15
0
AQL result
Target ACCEPT
ACCEPT
AQL working: Lot 8,000 → sample 200 → majors 0 (≤10) → minors 0 (≤14) → ACCEPT
Stage 5 of 5
Carton, label and shipping-mark verification before loading.
Carton count
—
Labels & shipping marks
Target Checked
Not checked
Ship date
—