300TC cotton percale bedsheet set
QC progress
Milestone-based visibility. Mill processes stay confidential. You see every inspection result as it is recorded; mill identity and floor notes are shared only where Multifabric has agreed it with the mill.
Planned vs actual dates for each production milestone.
Fabric booking
On time
Yarn & weave check
1 day early
Dyeing & lab dip approval
2 days early
Cutting
1 day early
DUPRO
2 days early
Final AQL
On time
Ex-factory
On time
ETD (vessel departs)
2 days early
| Milestone | Planned | Actual | Status |
|---|---|---|---|
| Fabric booking | 4 Mar 2026 | 4 Mar 2026 | On time |
| Yarn & weave check | 18 Mar 2026 | 17 Mar 2026 | 1 day early |
| Dyeing & lab dip approval | 30 Mar 2026 | 28 Mar 2026 | 2 days early |
| Cutting | 11 Apr 2026 | 10 Apr 2026 | 1 day early |
| DUPRO | 23 Apr 2026 | 21 Apr 2026 | 2 days early |
| Final AQL | 9 May 2026 | 9 May 2026 | On time |
| Ex-factory | 14 May 2026 | 14 May 2026 | On time |
| ETD (vessel departs) | 21 May 2026 | 19 May 2026 | 2 days early |
Stage 1 of 5
Greige fabric checked against the approved construction.
Yarn count
Target 40 Ne ±3%
39.6 Ne
Thread count
Target 300 TC ±3%
306 TC
Fabric weight
Target 118 GSM ±5%
115 GSM
Tensile strength (warp)
Target ≥ 350 N
413 N
Mill process notes stay confidential.
Stage 2 of 5
Bulk shade and fastness tests against the approved lab dip.
Shade standard
Target Optic White 879
Optic White 879
Shade match ΔE (CMC 2:1)
Target ≤ 1.0
0.44
Colour fastness to washing
Target Grade ≥ 4
4
Rubbing fastness (dry)
Target Grade ≥ 4
4
Rubbing fastness (wet)
Target Grade ≥ 3
3
Mill process notes stay confidential.
Stage 3 of 5
During-production inspection of measurements, weights and workmanship.
Production complete
49%
Size / measurement checks
Target ≥ 95% in tolerance
29/30 (96.7%)
Weight checks
Target ≥ 95% in tolerance
20/20 (100%)
Workmanship defects
Target Majors ≤ 5% of sample
1 major · 1 minor in 80 pcs
| D03 | Shade variation | major | 1 |
|---|---|---|---|
| D10 | Soiling | minor | 1 |
Mill process notes stay confidential.
Stage 4 of 5
ISO 2859-1, General Level II, single sampling. Major AQL 2.5, minor AQL 4.0.
Lot size
5,700
Sample size (Level II)
200
Major defects (AQL 2.5)
Target Ac 10 / Re 11
6
Minor defects (AQL 4.0)
Target Ac 14 / Re 15
13
AQL result
Target ACCEPT
ACCEPT
AQL working: Lot 5,700 → sample 200 → majors 6 (≤10) → minors 13 (≤14) → ACCEPT
| D01 | Hole | major | 2 |
|---|---|---|---|
| D03 | Shade variation | major | 2 |
| D04 | Broken stitch | major | 1 |
| D05 | Measurement out of tolerance | major | 1 |
| D06 | Slub | minor | 5 |
| D07 | Loose thread | minor | 7 |
| D10 | Soiling | minor | 1 |
CAPA-1009-aql
CAPA closedOpened 7 May 2026Due 14 May 2026Re-inspection passed 9 May 2026Closed 10 May 2026
Mill process notes stay confidential.
Stage 5 of 5
Carton, label and shipping-mark verification before loading.
Carton count
713
Labels & shipping marks
Target Checked
Checked
Ship date
19 May 2026
Mill process notes stay confidential.